800 sqft Basement Finish
Framing already done by GC. We hung ~50 sheets of drywall, taped, mudded (3 coats), sanded, primed. 6 days, 2 installers.
Your trusted local team — same-day available across 9+ cities.
Get a Free QuoteBasements, additions, post-renovation rebuilds, ceiling replacement, full-room re-drywalling. From bare studs to paint-ready in a few days.
Drywall is one of those jobs where every shortcut shows up later — visible seams, cracks, screws popping out, wavy walls. We do it right the first time.
1/2" for most walls, 5/8" for ceilings and fire-rated assemblies (e.g. between garage and house, basement furnace rooms). We use the right thickness for code.
Drywall screws bite into studs and don’t pop out over time the way nails do. We use coarse-thread for wood, fine-thread for metal studs, set just below the surface for clean mudding.
All seams covered with paper tape embedded in mud. We don’t use cheap mesh tape on flat seams — it’s weaker and shows through paint. Mesh only on corner bead and patches.
3 coats of mud minimum, sanded smooth between coats, primed before paint. This is the industry-standard finish for residential interior walls — flat or eggshell paint shows no defects.
Skim coat over the entire surface for high-gloss paint or rooms with strong raking light (large windows, recessed lighting). Quoted extra — tell us if you need it.
Floor protection, plastic sheeting between work area and the rest of the house, HEPA vacuums for sanding. Drywall dust is fine and gets everywhere — we contain it.
From single accent walls to whole basement finishes.
Frame, drywall, tape, mud, sand — ready for paint. Most common big drywall job. Typically 4-7 days for a standard basement.
After framing and electrical/plumbing rough-in. We install both walls and ceiling drywall. Coordinated with your other trades.
For damaged or outdated ceilings (popcorn removal, water damage, sagging plaster). 5/8" drywall standard for ceilings.
Stub walls, half-height room dividers, knee walls. Custom framing + drywall combo.
New closet construction with framing and drywall. Pairs well with our door installation for full closet.
Resilient channels, double-layer drywall, soundproof insulation between drywall layers. Quoted custom — tell us what you’re trying to block.
Recent full drywall installs across the GTA.
Framing already done by GC. We hung ~50 sheets of drywall, taped, mudded (3 coats), sanded, primed. 6 days, 2 installers.
~280 sqft popcorn ceiling removed (asbestos test first), 5/8" drywall installed, taped + finished. 4 days.
After demo of damaged walls in a renovation. Hung 12 sheets, full finish, paint-ready. 3 days.
Framed and drywalled new ~5x7 walk-in closet off master bedroom. Coordinated with electrician for new light fixture. 2 days drywall.
Custom 4′ stub wall to divide open kitchen from dining nook. Framed, drywalled, finished both sides. 1.5 days.
After repairing structural damage, we re-drywalled the wall between attached garage and kitchen using 5/8" Type X fire-rated drywall per code.
Real, anonymized examples. Send your project details for a free quote.
Drywall installation is project-based. We quote after seeing the space — size, height, access, and finish level all affect the number.
Stub wall, single accent wall, or partial-room. 1-2 days.
Standard bedroom, dining, family room. 3-4 days including finishing.
800-1500 sqft basement or multi-room project. 5-10 days.
For the full pricing breakdown across 40+ services see our 2026 pricing guide.
Real projects from our portfolio — updated automatically.
Free in-home consultation. We'll measure, scope the job, and provide a fixed project quote.