Full Kitchen with Island
Demo existing, new custom cabinets, quartz counters + waterfall island edge, herringbone backsplash, premium appliance suite, herringbone hardwood patch. 8 weeks.
Your trusted local team — same-day available across 9+ cities.
Get a Free QuoteCabinet refresh, full gut renovation, layout reconfiguration, custom millwork — licensed trades in-house and detailed project management so your kitchen actually finishes on time and on budget.
Kitchens involve every trade. Plumbing under the sink, electrical for outlets and lighting, gas for the stove, custom cabinetry, tile, paint, sometimes structural work. One slow trade and the whole thing stalls.
Licensed plumber, ESA electrician, TSSA gas tech, cabinet installer, tile setter, drywaller, painter — all on our team. Coordination is internal. No 'I'm waiting on the plumber' delays.
Detailed line-item quote up front. Every change order documented in writing with new line items. No 'oh by the way' invoices at the end.
Kitchen refresh: 4-5 weeks. Full kitchen reno: 6-10 weeks. We tell you upfront. Slip happens occasionally (custom cabinets get delayed by suppliers) — we communicate in real time.
Most kitchen renos mean no kitchen for weeks. We help set up a temp kitchen (microwave + coffee + paper plates in a different room) and plan our work so demo doesn’t happen the week before Thanksgiving.
We source from quality suppliers (not just whoever has the cheapest particle board). Custom millwork available. Quartz and granite countertops. Backsplash tile expertise.
We coordinate with appliance delivery so your fridge, range, dishwasher, hood arrive at the right time. Pre-install measuring so the cabinet openings actually fit your appliances.
From cabinet face refresh to full structural reconfiguration.
Existing cabinet boxes kept, new doors + drawer fronts + paint. 1/3 the cost of new cabinets, takes 1-2 weeks. ~$8,000-$18,000.
New countertops (quartz, granite, butcher block) + new backsplash tile. Often done with cabinet refresh for biggest visual impact. $10,000-$22,000.
New cabinets, counters, appliances, flooring, plumbing fixtures, lighting, paint. Same layout. $45,000-$80,000 typical.
Removing/relocating walls, repositioning sink/stove/fridge, adding island, opening to living room. Significant scope — structural and trade coordination. $65,000-$120,000+.
Adding new island to existing kitchen. Includes flooring patch, electrical (for outlets), plumbing if sink included, ventilation. $8,000-$20,000 depending on features.
If full reno is overkill: paint cabinets, new hardware, new faucet, lighting upgrade, fresh wall paint, new floor. Done in 1 week. $4,000-$10,000.
Recent kitchen projects across the GTA.
Demo existing, new custom cabinets, quartz counters + waterfall island edge, herringbone backsplash, premium appliance suite, herringbone hardwood patch. 8 weeks.
Kept existing cabinet boxes, new shaker doors + drawer fronts, painted, new quartz counters, new subway tile backsplash, new faucet. 3 weeks.
Removed non-load-bearing wall between kitchen and dining. New layout with peninsula. Coordinated structural engineer for load review. 10 weeks.
Added 6×3 ft island to existing kitchen. Electrical for outlets, plumbing for prep sink, marble counter, custom storage. 4 weeks.
700 sqft condo with builder-grade kitchen. New cabinets to ceiling, quartz, induction cooktop, hidden hood. Worked within building hours. 5 weeks.
Painted existing oak cabinets BM Cloud White. New brushed brass hardware. New backsplash tile. Customer kept counters and appliances. 2 weeks.
Real, anonymized examples. Send your project details for a free quote.
Kitchen renovation pricing depends heavily on cabinet selection, counter material, and scope of layout changes. Free in-home consultation with detailed quote.
Re-face existing boxes, new counters, backsplash, paint. 3-4 weeks.
All new cabinets, counters, appliances, fixtures. Same layout. 6-8 weeks.
Wall removal, island addition, full design rebuild. 8-12 weeks.
For the full pricing breakdown across 40+ services see our 2026 pricing guide.
Real projects from our portfolio — updated automatically.
Free in-home consultation, design discussion, and detailed quote. Most quotes ready within 5-7 business days for full kitchens.